1 If there is a road slope
Barrier to be installed on a level road. Should be pouring device level device units, while Parking Barrier System wiring must be in accordance with the time to note the correct wiring diagram and operation;
2 local sense red light flashes when you can use an iron on top of the coil
Parking Barrier Systems transportation equipment field first after good line test and the sense is operating properly. Long bright red when removed iron, Barrier automatically fall if it represents the product to normal;
3 ground cut a 10 cm deep, 2X0.8M square nest, a 45 ° bevel cut corners, Rui passers suggested sense coil a circle into them, generally for 5 to 6 layers
Sense coil wiring time. Each layer is preferably between coil compression coil inside do not have joints. Twisted sense coil output to the Barrier, and the shorter the distance the better, after being connected to the nest and then dry cement seal;
4 Try to avoid joint
Sense coil in laying process can not be damaged. Otherwise, there will not normally Barrier gate, drop gates, and showed off the vehicle and can not automatically brake and other faults;
5 according to the site conditions on the barrier rod lengthened and tailoring
Parking Barrier system in the factory before the spring rod length adjustment according to the torque balance. Efforts should be re-adjusted to the balance spring, otherwise overheating of the motor and gear box showing excessive wear and tear;